Why Data Centre Construction Is Becoming India's Next Infrastructure Boom
A slow yet noticeable revolution seems to be underway within India's industrial real estate segment. Cranes are being put up in regions that weren't even considered five years ago. The speed of land tract acquisition in metro regions and Tier-II cities is comparable to the boom period experienced by commercial real estate over the last decade. All of this activity revolves around one common factor - data.
The Indian Data Centre Construction Industry has ceased to remain a small niche segment within the larger realm of industrial real estate. It has become one of the most critical infrastructure segments of the decade - an industry at the confluence of digital transformation, policy, and international investment flows. For EPC companies that recognise the intricacies of setting up such facilities, the upside potential is huge.
A Market That Is No Longer Speculative
For quite some time now, the development of data centres in India has been just a back-end necessity for telecom companies and a few big corporations. Times have changed; there is no going back.

Data centres saw more than 1 gigawatt of growth in India from 2020 to 2024. Experts estimate this will rise threefold by 2027. Places such as Mumbai, Chennai, Hyderabad, Pune, and Delhi-NCR are well-known data centres. However, data centres are not being built only in Tier-I locations. With cheaper land availability and improvements in power supply infrastructure, Tier-II cities are entering the game with government support.
What makes this happen? Here come three factors coming together: an exponential increase in mobile internet users, increased adoption of cloud services by Indian firms, and most importantly, AI infrastructure becoming available.
#AI Infrastructure Is Rewriting the Construction Brief
Traditional data centres were difficult to build. It required perfection in the way power was distributed, redundancy in the cooling system, a raised floor, structured cabling, and fire suppression, among other things, all done on a very short timeline and with a lot of attention to detail. The infrastructure used for AI technology has made this a much more difficult process.
AI workloads are dense on GPUs. While the power usage of one high-performance computing rack in an AI data centre can range from 30 to 100 kW, a traditional IT rack uses 5–10 kW. All the factors governing how a facility should be engineered have changed. Power density, cooling technology, load planning, and generator sizing are among the things that need to be revised.
For EPC contractors, this translates to the engineering of an intricate process. The civil, mechanical, and electrical engineers cannot work in silos. Precision is needed at every level, from substation design and transformer sizing to the positioning of cooling systems and even the commissioning of uninterruptible power systems.
## Industrial Projects of a Different Kind
It would be a gross oversimplification to regard data centre construction as just another specialised civil construction project. Indeed, on a grand scale, this type of project is nothing less than an all-encompassing industrial project, where logistics, supply chain management, and systems integration are equally complex as in an automotive manufacturing plant or in a major engineering works.
Just imagine all the work involved in constructing a hyperscale data centre: land preparation and civil works; high voltage power supply system; mechanical systems for cooling and environment control; fire fighting and detection systems; security infrastructure; fibre and backbone network integration, and finally commissioning that has to comply with tough uptime warranties before bringing a single server online.
The EPC delivery model of engineering, procurement, and construction, carried out under one umbrella, has become a more popular choice among data centre customers for good reasons.
## Policy Tailwinds and Private Capital
The Indian government has been an important catalyst in this regard. The Data Centre Policy Framework, the various incentives provided by state governments for data centre parks, and the wider Digital India program have ensured a positive environment for investment in this sector, both domestic and international.
Hyperscale giants such as Microsoft, Google, AWS, Meta, and many others have already made investments worth several billion dollars in India's data centre infrastructure over the next five years. The local players are aggressively scaling up their operations. The colocation facilities are growing at a much faster pace than ever before demanded by their booking requirements. The funds are available. Now the need is to execute this effectively.
## Where Pragati Infra Solutions Limited Stands
Construction of highly technical and sophisticated industrial facilities is an area of expertise in which PISL has been engaged since 2009. Over the years, PISL has successfully implemented large-scale EPC projects in industries that require the same level of proficiency and skill as data centres – precision engineering, tight timelines, multidisciplinary coordination, and the ability to deliver quality in large quantities.
With over 600 personnel, a project portfolio exceeding 16 million square feet, and experience across multiple industries, including warehousing, automotive, heavy engineering, and industrial manufacturing, PISL boasts capabilities that perfectly match those required for a data centre.
PISL's latest agreement with AG&P Industrial to develop India's first-ever advanced modular EPC & fabrication facility in the state of Andhra Pradesh is another signal of PISL's willingness to push the boundaries of large-scale project implementation in India through EPC. This very capability - modular, scalable, and precise is exactly what is needed in a partner by the data centre industry.
Progressive. Innovative. Sustainable. Limitless. These are not merely PISL's brand values. They are exactly the approach needed to construct data centres in their purest form.
## Sustainability Is Not Optional Anymore
With more data centres popping up in India, there is now more focus on the resources they require. It takes just one hyperscale data centre to match the electricity consumption of an entire town and use a million litres of water per year for cooling purposes. The growing ESG standards and the introduction of energy efficiency standards by regulatory bodies in India have made sustainability a must-have design parameter rather than a bonus one.
It means that each of the steps of data centre construction should consider sustainability, from designing energy-efficient building envelopes to installing renewable power sources and creating cooling systems based on water recycling and waste management solutions. Green building certification systems such as LEED and IGBC will need to be adhered to. In other words, for engineering, procurement, and construction (EPC) partners, it is necessary to consider sustainability as a factor at par with power density and load.
And it is here that the choice of the right construction partner comes into play. Sustainability is not just a buzzword in PISL’s business approach but one of the core principles applied to every major construction project in India.
## The Bottom Line
The development of data centres is the next big infrastructure segment for India, and it is coming in full force, not incrementally.
With a robust pipeline of data centre projects fuelled by demand generated by the application of artificial intelligence, investment by hyperscalers, government support, and digitisation, the task of constructing India's data centre infrastructure presents an exciting challenge for companies with the right skill set.
This is not a question of whether India's data centre infrastructure will be built, but rather of who will build it.